What is happening...

13 September 2019

Vertical precast concrete plant

Client: SPL Year: 2018 Description: a 24m3 truck discharge hopper, a 80m 250T/h conveyor, a distribution conveyor (by rotation) that allows the 4 aggregate bins to be filled (375T total), […]
13 September 2019

Horizontal precast concrete plant with in-line hoppers in Saint-Aubin Sur Gaillon.

Client: S2G Year: 2018 Description: Constraints imposed by the client: The new concrete plant had to be conceived so that the whole design is homogeneous with the existing building. The […]
13 September 2019

Retrofitting of a ready mix concrete plan in Lescar.

Retrofitting of a ready mix concrete plan in Lescar. Client: Béton Contrôlé du Béarn (Groupe Daniel) Description: Supply and construction of a new hopper tower (?) with 6 bins (2 […]