Retrofitting of a ready mix concrete plan in Lescar.
13 September 2019
Vertical precast concrete plant
13 September 2019

Client: S2G

Year: 2018

Description:

Constraints imposed by the client:

  • The new concrete plant had to be conceived so that the whole design is homogeneous with the existing building.
  • The cleaning station for the concrete skips had to be designed in order to optimize safety.